PauloMongo
Programmer
I have created a report in CR8.5, after having to start the Job Server and Page Server manually I can schedule a report to run, and this works Ok, but I can not run the same report on demand, initially after 5 minutes IE5 would time out, but have amended this problem to alter the timeout time via microsoft's web site, has any body had this problem before?
I am connecting to a Progress database via ODBC using the Merant driver supplied by Progress, the same driver is also shipped with CR8.5, I have contacted Crystal and after 3 weeks they still can not help, so can you ?
I am connecting to a Progress database via ODBC using the Merant driver supplied by Progress, the same driver is also shipped with CR8.5, I have contacted Crystal and after 3 weeks they still can not help, so can you ?